Traffic

Click to Interact
Type
Location
Description
Time
incident
SR-589NB
Accident. Left lane blocked in Pasco on Suncoast Parkway NB between Mile Marker #33 Toll Gantry and County Line Rd (37). Reported by FHP Troop C
construction
N 15th StBoth NB/SB
Road construction. Roadway reduced to one lane in Hillsborough on N 15th St NB/SB between E Palm Ave and Nuccio Pkwy. Reported by FDOT Tampa Bay
construction
I-275Both NB/SB
Construction work in Hillsborough on I-275 NB/SB at Jefferson St (45A). Reported by 511 DOT
construction
CR-574Both EB/WB
Closed due to paving operations in Tampa on Broadway Avenue EB/WB under US 301. Reported by FDOT Tampa Bay
construction
SR-70EB
Road construction. Right turn lane blocked. in Tampa Bay on State Road 70 EB before 33rd St E. Reported by FL511
construction
SR-789SB
Road construction. Left lane closed in Sarasota on John Ringling Blvd. SB after US 41/Hwy 45/Bayfront Dr/Tamiami Trl. Reported by FL511
construction
SR-789NB
Road construction. Left lane closed in Sarasota on John Ringling Blvd. NB after US 41/Hwy 45/Bayfront Dr/Tamiami Trl. Reported by FL511
construction
I-75None
Interchange Improvements in Pasco on I-75 at SR-52 (Mm285). Reported by FDOT Tampa Bay
construction
SR-586EB
Road construction. Right lane closed in Pinellas on Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd. Reported by 511 DOT
construction
I-4Both EB/WB
Interchange Improvements in Orange on I-4 EB/WB at SR 535 (MM 68). Reported by DOT
construction
I-275Both NB/SB
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
construction
54th Ave NWB
On-ramp closed in St Petersburg on 54th Ave North WB on-ramp from SB I-275. Reported by FDOT Tampa Bay
construction
CR-575Both NB/SB
Closed due to road construction in Trilcoochee on Trilby Rd/Burwell Rd (CR 575) NB/SB between Breeden Rd. and US 301. Reported by FDOT Tampa Bay
construction
I-275SB
Long-term road construction in Tampa on I-275 SB to EB I-4. Reported by FDOT Tampa Bay
construction
I-4WB
Long-term road construction in Hillsborough on I-4 WB to NB & SB I-275. Reported by FDOT Tampa Bay
construction
US-19Both NB/SB
Long-term road construction in Pinellas on US 19 NB/SB between SR-580 and County Road 95. Reported by FDOT Tampa Bay
construction
I-275Both NB/SB
Road construction in Palmetto on I-275 NB/SB before 36th Ave E and near US 19 (Mm5). Reported by FDOT
construction
Fruitville RdBoth EB/WB
Interchange construction in Sarasota on Fruitville Road (SR 780) EB/WB between Honore Avenue to past Coburn Road. Reported by FDOT
construction
US-301Both NB/SB
Paving operations in Riverview on US 301 (M/H/P) NB/SB from Bloomingdale Ave/Progress Blvd to Dr King Jr Blvd. Reported by 511 DOT
construction
Price BlvdWB
Long-term road construction in Sarasota on Price Blvd WB between Toledo Blade Blvd and Sumter Blvd. Reported by FL511
On Air102.5 The Bone - Real. Raw. Radio. Logo

    mobile apps

    Everything you love about theboneonline.com and more! Tap on any of the buttons below to download our app.

    amazon alexa

    Enable our Skill today to listen live at home on your Alexa Devices!